Constraints Report > North > 1. Introduction > 1.4 Objectives of the Constraints Study

1 Introduction

1.4 Objectives of the Constraints Study

The Constraints Study has been carried out at an early stage of the project with the objective of gathering as much background information relating to the project as possible. This data collection is focused on determining the constraints including physical, environmental and engineering constraints, that exist and could affect the location, design and progress of the scheme.

This report records the collection of data to the end of March 2001. In particular research on the engineering and environmental constraints have been carried out and recorded. The size of the scheme, approximately 105 kilometres in length, and extent of the initial study area has resulted in a staged approach to data collection. Early work has resulted in a reduction of the initial study area (see Chapter 4) and further, more detailed, data collection will be carried out in parallel with the route corridor development.

 